The BAUER Anchor
10
BAUER Anchors on Site
Heart of Doha, Qatar - Wire Strands
On an area of approximately 350,000 m², Qatar executed the project “Heart
of Doha”. By constructing theatres, various buildings, museums, hotels, a
mosque and schools, a bridge is built between the past and the ultra-modern
present. BAUER International Qatar LLC had to install pile walls, foundation
piles, do soil excavation, a dewatering system and tie-back of excavation
walls within a period from mid 2009 to mid 2011. A total of approximately
2,700 anchors were installed.
Historic Museum, Frankfurt - Staggered Anchors
We were awarded by the City of Frankfurt on the Main to do the excavation pit
with a depth of 10 m right in the heart of the City for the new Historic Museum.
We installed a secant bored pile wall with a pile diameter of 880 mm and a
depth of 22 m. It was tied-back with 4,400 m staggered anchors with a length
of up to 35 m.